Quantcast
Channel: Pdf Repair Manual Download » flat surface
Viewing all articles
Browse latest Browse all 2

2007-Up Toyota Tundra 2WD/4WD ADJUSTABLE UPPER STRUT FRONT LIFT/ LEVELING KIT INSTALLATION MANUAL

$
0
0

download
Step 1: Measure current front ride height. Take a measurement from the bottom of the wheel/rim to the lip of the fender on each side of the vehicle. Write down measurements to help in determining ride height after new kit is installed. (Figure A) Step 2: Position vehicle on a flat surface or automotive lift. Suspend front wheels , lifting by the frame with a floor jack or lift jack. Secure using jack stands and wheel chocks. Be sure engine is turned OFF and vehicle is in PARK. Remove tire/wheel assembly on ONE side of vehicle . Step 3: Support Spindle to protect ABS system and brake lines! LOOSEN, but don’t completely remove upper ball joint nut, outer tie rod nut and sway bar link nut at the lower control arm. Step 4 : Break Outer tie rod and ball joint from their tapers using tools specific to this procedure. CAREFULLY, while supporting the spindle assembly, completely remove upper ball joint nut & tie rod nut, leaving the loosened sway bar link nut in place. ( Figure B) Step 5: Remove strut assembly from the vehicle. Remove LOWER strut bolt first, followed by the three (3) upper strut nuts. CAUTION! BE EXTREMELY CAREFULL TO SUPPORT STRUT ASSEMBLY WHEN REMOVING UPPER STRUT NUTS! The Strut/Spring assembly is heavy and can cause injury to technician or damage to other components if released too quickly! (Figure C) Step 6: Apply 50% of the INCLUDED Synthetic Grease to the TOP of the THREADED INNER ADJUSTMENT SCREW, as illustrated. (Figure D) Step 7: Using the original OEM stud nuts , secure new Adjustable Upper Strut Kit to OEM upper strut studs and torque to manufacturer’s specifications. (Figure E) IMPORTANT! Be sure the Threaded Adjustment Screw Rotates FREELY after securing kit to OEM top of strut! If not, slightly loosen the three upper stud nuts and reposition Threaded Adjuster Screw UPWARD slightly. Retorque upper stud nuts to manufacturer’s specifications and recheck that Inner Adjuster Screw rotates freely. Step 8: Install the Top Connection Plate ONLY, studs directed UPWARD, into position in the strut tower, and secure with the NEW Nylock stud nuts supplied with this kit. Torque stud nuts to OEM specifications. (Figure F) Step 9: Reinstall strut assembly . Be sure the new Adjustable Upper Strut Kit is THREADED DOWN in the MOST COMPACT POSITION for easiest reassembly, then pass exposed threaded area of the kit THROUGH the center of the Top Connection Plate already installed. HINT: The use of a pry bar or breaker bar may simplify reinstallation of the Strut Assembly. (Figure G) Step 10: Install Large 1-1/4-12 Adjustment Locking Jam Nut included with this kit and tighten until snug to Top Connection Plate. Install Snap Ring included with kit.


Viewing all articles
Browse latest Browse all 2

Latest Images

Trending Articles





Latest Images